DESCRIPTION OF WORK:Barvi Water Supply Schme Construction of RCC box culvert by a push through technique for re-alignment of B.G Main at Ch. 16500 near Nilje Railway crossing on Diva- Panvel section
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:TTC Water Supply Scheme (Ransai Feeder); Replacement of existing 900mm/1000mm dia old, damaged MS pipeline by 900mm dia MS pipeline between Ch 0 to 2700m & Ch 4610 to 5150m.
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Barvi Water Supply Scheme; Replacement of 1772 mm dia MS pipeline B.G. Main I & II between Ch. 16000 to 16060 & Ch.. 17200 to 17480 along Shil- Kalyan Road.
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Thane Complex W/S/S…; Rehabilitation & Strengthening of Creek Bridge near Saket Complex
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Kalyan Bhiwandi Indl. Area….; Providing, laying, jointing & commissioning 500 mm dia MS pipeline from Tembghar to kalyan Bhiwandi Indl. Area
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Raising Height of Barvi Dam, construction of the overflow section of section of Barvi Dam (balance Work)
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:TTC Industrail Area….; Replacing 900mm dia TTC Main from Mahape Junction to Thane-BelapurRoad along Shil-Mahape Road.
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Thane Complex water supply Scheme…; Replacement & strengthening of 1590mm dia North Feeder MS pipeline between Ch.7320 to 7870m,7930 to 8050m, 8320 to 8370m, 8940 to 9080m, 9600 to 9960m, 9980 to 10340m & 10620 to 10790m
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Roha Industrial Area…. Replacement of existing effluent line M/s Sudarshan Chemical Industries Ltd. Plant to CETP
• CLIENT NAME: CENTRAL RAILWAY
DESCRIPTION OF WORK:Widening/Improvement/Training/works of culvert on CLA – TMBY line by Cut & Cover method in Chrai nallah. (II) Widening/ improvement/ Training/ works of culvert on CLA- TMBY line by cut & cover method in Refinery.
• CLIENT NAME: CENTRAL RAILWAY
DESCRIPTION OF WORK:Widening/Additional way of existing bridge No. 9/1(1×2.50×1.50m) RCC box by 1/1.8×1.35m RCC box cut and cover method at km 9/61-10/1 on CSMT-Panvel (Harbour) section (Wadala Nallah). B) Additional Bridge Opening of 1/2 x 1.20 m RCC Box by Cut and Cover method at Km 13/3-4 on CSMT-Panvel (Harbour) Chunabhatti Nallah.
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:D.C Work…. Lowering of B.G. Main I-II-III between ch.12600 and 12700mtr for Proposed D.P Road near village Hedutane.
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Mahad Industrial area WSS, Replacement of DI distribution pipeline to effluent affected villages
• CLIENT NAME: MIDC
DESCRIPTION OF WORK:Deulgaon Raja MSNA Phase-II Water Supply Scheme
• CLIENT NAME: CENTRAL RAILWAY
DESCRIPTION OF WORK:Widening/Improvement/Traning work of Culvert at VVH by cut and cover method in somaya Nallah under ADEN(T) Byculla Section